What Is The Reasonable Apportionment Of Fault? The Case Of The CNRL Emulsion Pipeline Failure

In Canadian Natural Resources Limited v. Wood Group Mustang (Canada) Inc. (IMV Projects Inc.), 2018 ABCA 305, the Alberta Court of Appeal very recently dealt with an appeal arising from a trial judgment involving a novel, though ultimately faulty, underground oil pipeline.

CanadaEnergy and Natural Resources

In Canadian Natural Resources Limited v. Wood Group Mustang (Canada) Inc. (IMV Projects Inc.), 2018 ABCA 305, the Alberta Court of Appeal very recently dealt with an appeal arising from a trial judgment involving a novel, though ultimately faulty, underground oil pipeline. The trial judge found all of the parties to be negligent in some respects, and that the Plaintiff had suffered damages in the sum of $45 million. On appeal, the trial judge's apportionment of responsibility was the principal issue.

The Plaintiff, Canadian Natural Resources Limited ("CNRL"), decided to build a buried 32 km emulsion pipeline between its Primrose East Plant and its Wolf Lake Plant that would carry extra-hot emulsion (a mixture of bitumen, hot water, and steam). Building such a pipeline underground was a singular undertaking that presented new engineering challenges. CNRL retained IMV Projects to provide it with engineering advice on the design and construction of the pipeline. Shaw

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

See more popular content from