A victory for persistence in relation to subsidence of land

Owners of improvements on land can recover proper and recurring costs to prevent or mitigate anticipated future damage.

AustraliaReal Estate and Construction

In a short but interesting judgment, the High Court ruled in favour of the appellant in Jemena Gas Networks (NSW) Ltd v Mine Subsidence Board [2011] HCA19.

Jemena Gas Networks (Jemena) was the owner of a gas pipeline that ran above a series of "panels" that were proposed for longwall mining. Expert consultants advised Jemena that there would be subsidence at a certain point following mining of the panels under their pipe. Jemena expended a considerable sum to prevent the pipeline from being damaged by the predicted subsidence. The subsidence occurred as predicted by the experts.

Jemena had made a claim for compensation under the Mine Subsidence Compensation Act 1961 (NSW) (the Act) to recover the costs of the preventative and mitigatory works from the Mine Subsidence Compensation Fund (Fund).