Kesikli Law Firm

Kesikli Law Firm

Global

Focus on…

Electricity Storage and Support Mechanisms Under Turkish Law

I. INTRODUCTION Turkey's dynamic regulatory framework, anchored by the Electricity Market Law and its accompanying regulations such as Storage Regulation, License Regulation, and YEKDEM Regulation, unveils a compelling landscape for investors seeking to seize opportunities in the burgeoning electricity storage sector. By embracing a progressive approach, Turkey has established an advantageous environment for the establishment and operation of electricity storage facilities. In this article, we will delve into the essential provisions and notable advantages that await prospective investors who are keen on embarking on electricity storage projects in Turkey.   II. INCENTIVES FOR ELECTRICITY STORAGE PROJECTS Although "Green Field Projects" and "Brown Field Projects" are not legally defined terms in the applicable law, we will be using these terms for ease of reference and understanding. In the context of electricity storage, greenfield projects would involve the establishment of new facilities or technologies for storing electricity. In contrast to greenfield projects, brownfield projects involve investments in existing facilities, i.e. increase in the capacity or installation of new units. In the context of electricity storage, brownfield projects for storage would involve utilizing or retrofitting existing infrastructure for storing electricity. A. Green Field Projects Exempted from The Competition Process of YEKA: Under Article 7, sub-article 10, legal entities planning to establish an electricity storage facility can be granted a pre-license by EMRA for establishing a wind and/or solar energy-based power generation facility with a capacity equivalent to the storage facility. This is considered an incentive as new capacities were previously granted through competition process of YEKA. Simplified Pre-License Applications: It is provided that the fourth paragraph of Article 7 of the Electricity Market Law (e the criteria applicable to wind and solar energy-based power generation facilities) on the evaluation of pre-license applications for the establishment of electricity generation facilities shall not apply to the generation facilities that fall within the scope of these projects. YEK Support Mechanism: These projects may also benefit from the YEK Support Mechanism (YEK Support Mechanism will be explained in depth below.). Domestic Contribution Support: These projects may also benefit from Article 6-B of the YEK Law with the amendment dated April 4, 2023. Therefore, domestic contribution support for equipment to be used in electricity storage investments has been regulated as another incentive. B. Brown Field Projects Capacity Increase for Existing Facilities: Sub-article 11 of Article 7 allows legal entities holding a wind and/or solar energy generation license to increase their capacity up to the installed capacity of the electricity storage facility they plan to establish. The capacity increase must not exceed the licensed site boundaries, the existing capacity supplied to the system, and requires a positive connection opinion from TEIAS (Turkish Electricity Transmission Corporation) and/or the relevant distribution company. YEK Support Mechanism: Capacity increases under brownfield projects are exempted from the restriction in Article 6/C of the YEK Law, which normally prevents capacity increases from benefiting from the YEK Support Mechanism. In other words, capacity increases through storage activities can qualify for the support mechanism for the electricity supplied to the system (YEK Support Mechanism will be explained in depth below). Licensing Exemption: Article 4 of the Electricity Market Law states that certain activities require a license, while Article 14 allows electricity storage activities to be carried out without a license, subject to limits and procedures determined by the Energy Market Regulatory Authority (EMRA). Furthermore, pursuant to License Regulation, a legal entity engaging in market activities must obtain separate licenses for each activity and each facility where the activities will take place, except for certain exceptions. In this regard, the electricity storage unit within a generation facility, integrated storage units, and auxiliary resource units used in multi-source generation facilities are considered part of the main resource-based facility and can be evaluated under a single license. C. Incentives That Are Applicable To Both Greenfield And Brownfield Projects YEK Support Mechanism: Electricity storage projects (both greenfield projects and brownfield projects) in Turkey can benefit from the YEK Support Mechanism, governed by the Law on the Use of Renewable Energy Resources for Electricity Generation (YEK Law). Overall Benefits of the YEK Support Mechanism: Diversity of Supported Energy Sources Reducing Environmental Damages from Fossil Fuels Reducing Energy External Dependency Advantages of the YEK Support Mechanism for the Projects: Long Term Support Mechanism: Generation facilities that fall within the scope of YEKDEM are provided with an electricity purchase guarantee at a fixed price for 10 years. This creates a stable investment environment for renewable energy projects and offers investors long-term income security. This can facilitate the financing of renewable energy projects. Payment System Based on Production Forecasts: Generation facilities within the scope of YEKDEM forecast the amount of electricity they generate for the following day in advance. According to these forecasts, the facilities are compensated for their production at a fixed price with a purchase guarantee. The use of this system helps in the planning of electricity generation and the efficient functioning of the energy market. Fixed Prices and Durations: Commissioning: The date of commissioning is when a generation facility is officially put into operation, either partially or completely. Timeframe for YEKDEM Benefits: If a generation facility is fully operational, it can benefit from YEKDEM starting from the date of commissioning. If a generation facility joins YEK Support Mechanism before it is fully operational, it can benefit from YEK Support Mechanism for ten years from the date it first joins the program. For facilities that became operational between January 1, 2021, and June 30, 2021, they can benefit from YEKDEM until December 31, 2030, as per a Presidential Decree issued on September 17, 2020. Capacity Increases: If a legal entity requests to increase the installed power capacity of their generation facility and it is approved by the relevant authority, the benefits provided by YEK Support Mechanism for the increased capacity may vary: Capacity increases made within the scope of the eleventh paragraph of Article 7 of the Law (unspecified in the provided text) will benefit from YEK Support Mechanism for the remaining term of the facility's original YEK Support Mechanism benefits. However, legal entities whose installed power increase requests are approved by the authority as of February 28, 2019, and whose license amendments are made within this scope cannot benefit from YEK Support Mechanism for the increased capacity. Licensing Exemption: Pursuant to Article 7/1/e of License Regulation, “Market activities carried out within the scope of electricity storage and demand response within the framework of the limits, procedures and principles to be determined by the Board in consultation with the Ministry” is exempted from the license requirement.   III. REQUIREMENTS AND REGULATIONS 1. Integration into Existing Generation Facilities (Brown Field Projects): Companies holding licenses for power generation or participating in the YEK Support Mechanism can install storage units within their licensed generation facilities, as per Article 5 of the Storage Regulation. The capacity of the storage unit must not exceed the specified capacity in the facility's license, and it must be installed at the same measurement point as the facility for YEKDEM beneficiaries. 2. Connection and Utilization: The connection and utilization of integrated storage units, storage units within storage facilities, and stand-alone storage facilities are governed by the provisions outlined in the Electricity Market License Regulation. Unlicensed electricity generation facilities that have received a call letter can establish electricity storage facilities and engage in monthly offsetting for surplus energy, complying with the conditions specified in the Regulation on Unlicensed Electricity Generation. 3. Compliance with Regulations: Activities carried out through electricity storage units or facilities must comply with the regulations specified in the Storage Regulation. This includes integrating storage units into generation or consumption facilities, establishing detached storage facilities, and grid operators establishing their own storage facilities.   IV. CONCLUSION In conclusion, Turkey has established a progressive regulatory framework and support mechanisms for electricity storage projects, both in greenfield and brownfield contexts. The incentives provided by the government aim to encourage investments in the electricity storage sector and contribute to the country's renewable energy goals. Greenfield projects benefit from exemptions in the competition process and simplified pre-license applications, while brownfield projects can increase their capacity within the boundaries of existing facilities. Both types of projects can take advantage of the YEK Support Mechanism, which offers long-term income security through fixed-price electricity purchase guarantees. Additionally, licensing exemptions and regulations ensure the seamless integration, connection, and compliance of storage units and facilities. With these favorable regulations and support mechanisms, Turkey presents attractive opportunities for investors looking to participate in the growing electricity storage market.

Enforcement of Foreign Judgments in Turkey

Foreign court judgments are not directly enforceable in Turkey. According to Art. 50 of Private International Law and Procedure Act numbered 5718 (the “Act”), a final judgment rendered by a foreign civil court can only be enforced in Turkey if a competent Turkish court decides that it is enforceable. Therefore, those holding a foreign court judgment to be enforced in Turkey need to go through a court proceeding to make that court judgment enforceable. As a result of this procedure, if successful, a competent Turkish court will render an enforcement judgment (“exequatur”) with the result of giving enforceability to the foreign court judgment. This article summarizes the conditions for enforcement of a foreign judgment under Turkish Law.   Finality of Judgement The Act requires the judgment, enforcement of which is sought in Turkey to be final. A foreign court judgment that has not yet been finalized cannot be enforced in Turkey. The issue of whether the judgment has been finalized is determined as per the laws of the country where the judgment was rendered. It is important to note that whether the laws of the country where the judgment was rendered allow court judgments to be executed without being finalized does not make any difference here. Connected with this requirement, according to the Art. 53 of the Act, an official document or certificate confirming the final nature of the judgment enforcement of which is sought must be submitted with the petition initializing the enforcement proceeding.   Reciprocity According to the Art. 54(1) of the Act, there should be either an agreement, on a reciprocal basis between the Republic of Turkey and the state where the court decision is given (“contractual reciprocity”) or a de facto practice (“de facto reciprocity”) or a provision of law enabling the authorization of the execution of final decisions given by a Turkish court in that state (“legal reciprocity” or “de jure reciprocity)”. The reciprocity condition, one of the enforcement conditions specified in Article 50 and Article 54 of Law No. 5718 on International Private and Civil Procedural Law (“the IPCPL”), plays a vital role in practice, which must be examined ex officio by the court in the enforcement proceedings. Pursuant to Article 54/a of the IPCPL, enforcement of a foreign court judgment is dependent on “an agreement on reciprocity between the Republic of Turkey and the state where the judgment was issued or the existence of de jure or a de facto practice that enables enforcement of the judgments given by Turkish courts in that state”. In evaluation of the reciprocity, the first aspect to be considered should be whether there is a treaty or international agreement under which enforcement of foreign judgments is accepted. If Turkey and the state where the judgment in question was granted, are parties to such a treaty or international agreement, this would prove the existence of contractual reciprocity between those two countries. If such a treaty or agreement does not exist, enforcement would still be possible in case of the existence of de jure or de facto reciprocity. In order for the de jure reciprocity to exist, the enforcement conditions in the law of the country where the judgment was granted and the enforcement conditions regulated in Article 50 of the IPCPL and the following, should be at least equivalent. There will be no de jure reciprocity between Turkey and the states that have legislation that includes provisions that provide for stricter conditions for the enforcement of Turkish Judgments compared to the enforcement conditions for foreign judgments in the IPCPL. In evaluating whether there is de jure reciprocity or not, it would be more appropriate to make a general evaluation rather than requiring the existence of the same enforcement conditions in the laws of both countries. We would like to mention on the prohibition of examination of merits (revision) at this stage. Contrary to Turkish law, if foreign law adopts the revision system, it is very difficult for de jure reciprocity to exist. Because under Turkish enforcement law, it is forbidden to examine the merits of the case, other than for the purposes of evaluation of whether the conditions in Articles 50 and 54 of the IPCPL are fulfilled. Reopening the merits of the foreign judgments and review of the accuracy of the same are not allowed under Turkish Law . In summary, an important issue in considering whether there is de jure reciprocity is the existence of provisions that allow the enforcement of foreign court judgments in the laws of the state where the enforcement of the judgment is sought. In this vein, equivalence between enforcement conditions is essential. Differences between the legislation of respective states that do not significantly complicate the enforcement of foreign court judgments do not constitute an impediment regarding de jure reciprocity. Even if contractual or de jure reciprocity exists, if the judgments of Turkish courts are not enforced de facto by the state where the judgment is granted, the reciprocity is not considered to exist. This would be called a negative de facto practice, and the Turkish Court of Cassation held in its judgments that there is no reciprocity in such cases. On the other hand, to be able to hold that negative de facto practice exists, it should be proved that the courts of the state where the enforcement of the judgment was sought, must have rejected the enforcement of the Turkish court judgment; despite meeting all the conditions of enforcement under the laws of such jurisdiction. If the rejection of the enforcement of the Turkish court judgment is based on valid reasons according to the law of the foreign state, it cannot be concluded that there is no reciprocity on the grounds of negative actual practice. The de facto practice is always important in determining reciprocity. However, it should be kept in mind that the positive de facto practice is always easier to prove. In order for positive de facto reciprocity to exist, a similar Turkish court judgment must be enforceable in the state where the foreign judgment is issued. Despite an agreement or legal arrangement that establishes reciprocity, the fact that any judgment of Turkish courts has not been enforced yet in practice, because of a lack of request regarding this issue in the relevant state, may not be considered a mere reason for denial of an enforcement lawsuit. At this point, the issue of which date should be taken as a basis has particular importance in order to decide whether there is de facto reciprocity. This issue is controversial in Turkish literature. According to one opinion, the date of the enforcement judgment should be taken as a basis, while another opinion suggests that the filing date of the lawsuit should be. Another important issue in considering de facto reciprocity relates to the scope of de facto reciprocity. In other words, the question is as to whether there should be a different evaluation based on the subject matter of the lawsuit resulting in the judgment.  For example, assuming that de facto reciprocity exists in family law judgments, will this reciprocity also be applicable to foreign judgments relating to a commercial matter?  There is no consensus in the literature on this issue. An opinion suggests that de facto reciprocity should exist for judgments on the same subject, while another opinion defends that enforcement of any judgment granted by the court in such foreign jurisdiction (regardless of what its subject matter is) should be sufficient to establish reciprocity, as the philosophy underlying the condition of reciprocity requires. For the purposes of evaluating reciprocity (de jure and de facto), it does not matter whether Turkey recognizes such a specific state whose courts granted the judgment; in contrast to the evaluation of political reciprocity, where the parties to a specific treaty must recognize each other. If there is no contractual, de jure , or de facto reciprocity between Turkey and the relevant foreign state, the request for enforcement will be rejected. The question as to whether there is reciprocity between two states is one of the hardest issues in practice because there is no "central information source" to determine reciprocity. On the other hand, the judge has to examine ex officio and clarify whether the reciprocity exists. It is a very common practice for the Courts to consult with the official authorities about reciprocity matters. However, this method does not always work efficiently in practice and may even lead to inaccurate results. In addition to that, the existence of reciprocity can change over time and the Court of Cassation rules that in each case new research is required to be conducted. To sum up, it is necessary to examine in detail whether the reciprocity condition is met for the enforcement of foreign court judgments in Turkey. We believe that this examination should not be limited to the legislation and practices in Turkey in order to reach an accurate conclusion.   Exclusive Jurisdiction of Turkish Courts A further condition (negative) for the enforcement of a foreign court judgment in Turkey is that the judgment being sought to be enforced must not be on matters falling within the exclusive jurisdiction of Turkish courts. According to the High Court of Appeal, exclusive jurisdiction rules are for ensuring that the actions regarding issues regulated with these jurisdiction rules are only tried by Turkish courts (YHGK 04.03.2015, E. 2013/18-1628, K.2015/984). The underlying principle here is preservation of Turkish public order. In this vein, actions regarding real properties in Turkey, bankruptcy proceedings, labour disputes are considered within Turkish courts’ exclusive jurisdiction. It must be noted, however, these are not exhaustive. The Act does not explicitly state which actions fall within exclusive jurisdiction of Turkish courts. Therefore, the competent court will need to consider the underlying principle of jurisdiction rules and to determine whether the foreign court judgment is on a matter within the exclusive jurisdiction of Turkish Courts. Excessive Jurisdiction of the Foreign Court Another possible issue that may stand in the way of enforcing foreign court judgments is excessive jurisdiction—if the judgment has been rendered by a court that has deemed itself competent even if there is not a real relation between the court and the subject or the parties of the lawsuit However, in order for this to prevent enforcement decision, the counterparty must have raised its objection on this ground in the main proceedings.   Turkish Public Order A foreign court judgment cannot be enforced in Turkey if such a judgment explicitly contradicts the public order of the Republic of Turkey. In general, in order for this to constitute a legitimate ground for resisting enforcement of foreign court judgment, the judgment must be contrary to the fundamental rights and freedoms, fundamental principles of international law, due process of law or the right to be heard. However, as the concept of public order is a fluid one, it is not possible to set out exactly what would be contrary to it. This is mitigated by the fact that Art. 54(1)(c) of the Act stipulates explicit contrariness to public order. In other words, not every conflict with Turkish public order would suffice to prevent the enforcement of a foreign judgment. It needs to be an explicit one. With respect to the issue of public order, it was uncertain whether the fact that the foreign court judgment is without reasoning would contradict with public order of Turkey and different branches of the High Court of Appeals rendered inconsistent decisions regarding this issue. Afterward, it was settled by a decision of the High Court of Appeals’ General Assembly on the Unification of Judgement holding that mere absence of reasoning, per se, does not prevent enforcement of foreign court judgments (YİBGK 10.02.2012, E. 2010/1, K. 2012/1). Violation of Right to be Heard If the defendant’s right to be heard was violated, the defendant may resist the enforcement. If the defendant was not duly summoned pursuant to the laws of the state where the judgment was rendered or was not represented before that court, or the court decree was not pronounced in his/her absence or nonappearance in a manner contrary to the relevant laws of such foreign state, then the defendant may resist enforcement of that judgment in Turkey. However, the defendant must raise its objections in this matter before the court handling the enforcement proceedings. The courts are not allowed to consider these factors ex officio.   Satisfaction of the Judgement or Impediment for Enforcement Finally, the defendant may resist enforcement on the grounds that the judgment has been entirely or partially executed previously or an impediment has occurred preventing its execution. For instance, if the defendant against whom enforcement is to be sought no longer exists (e.g., has been wound up), then, in principle, it will not be possible to execute the foreign court judgment.   Competent Court The enforcement proceedings should be initiated before a civil court (in Turkish: asliye mahkemesi)". There are different branches of civil courts. In order to prevent delays, the competent court must be determined at the outset. In this vein, if the judgment enforcement which is sought relates to a commercial dealing between the parties, then commercial courts are competent to hear the case. After designating what branch of civil courts is competent, the geographic jurisdiction should also be determined. As a principle courts of the place where the defendant’s residence has jurisdiction to hear the enforcement lawsuit. If the defendant does not have a residence in Turkey, then the case needs to be brought where the defendant is based. In case none of these is applicable, then the case may be brought in Ankara, Istanbul, or Izmir. In conclusion, the enforcement of foreign court judgments in Turkey is a meticulous process that requires careful attention to a series of legal criteria. It is not a direct process and necessitates the verification of a foreign court judgment by a competent Turkish court through the mechanism of an exequatur. The key considerations include the finality of the judgment, its compatibility with the concept of reciprocity, the exclusive jurisdiction of Turkish courts, the absence of excessive jurisdiction from the foreign court, compliance with Turkish public order, and the respect for defendants' rights. Moreover, the judgment must not be previously enforced or face an impediment to its execution. The enforcement proceedings should ideally be initiated in a civil court where the defendant is based or has a residence. In the absence of such a place, the proceedings can be initiated in Ankara, Istanbul, or Izmir. Given the intricacies of this process, it is vital for holders of foreign court judgments to seek expert legal advice before initiating the enforcement proceedings in Turkey. The legal landscape in this area remains complex, with potential for evolving jurisprudence and legislative changes, which underscores the importance of obtaining specialized legal guidance.

Urban Transformation Projects in Risky Areas

1. Introduction Turkey's urbanization, which gained momentum in the late 20th century and continues today, has raised concerns regarding unstructured urban planning, construction in unsuitable regions, and technically deficient buildings. These challenges, exacerbated by Turkey's location in an earthquake-prone zone, have resulted in severe tragedies during catastrophic earthquakes and floods. The devastating earthquake of 2023 brought these issues to the fore, causing numerous fatalities, immense material damage, and large-scale migrations from affected cities. This unfortunate event emphasized the pressing need for livable spaces in Turkey that meet modern environmental requirements and urbanization models. As a result, urban transformation measures have been implemented with the goal of swiftly and effectively transitioning living areas in the country towards safety and structured planning. Urban transformation in Turkey is mainly divided into three models: (i) direct transformation of identified risky buildings, (ii) comprehensive transformation of risky areas, and (iii) creation of reserved building areas for future construction. The term "risky area" denotes regions that require total transformation, while "reserved building area" refers to the development of new urban spaces that meet modern living requirements. Urban transformation projects in risky areas are conducted under the auspices of Law No. 6306 on the Transformation of Areas Under Disaster Risk ("Urban Transformation Law") and the Implementing Regulation of Law No. 6306 ("Regulation"). These legal instruments were designed to involve owners of risky properties in the transformation process, allowing them to decide the timeline, model, and specifications of the projects managed by contractors. However, disputes between property owners and contractors stalled progress, leading to an amendment in the Urban Transformation Law in 2019. With the amendment, the Republic of Turkey's Ministry of Environment, Urbanization, and Climate Change (“Ministry”) has been empowered to ex officio undertake and perform urban transformation projects, along with the authority to assign independent contractors for actual construction projects. The government's ex officio authority was already in place before the amendment, provided through the expropriation/urgent expropriation authorities of the government. However, the use of this right created further disputes and prolonged the transformation processes. The amendment rectifies this by granting the government direct authority to intervene in the transformation process. The Ministry's ex officio authority now extends beyond transformation projects or properties in risky areas, reserved building areas, or projects on independent risky buildings. A new definition in the Urban Transformation Law broadens the Ministry's authority, allowing it to exercise its ex officio right in areas where buildings are at risk of demolition, where buildings have collapsed or are severely damaged, or where there is a risk of severe damage due to ground shifts, landslides, floods, rock falls, fires, explosions, etc.   2. Urban Transformation Process in Areas Designated As Risky The process of urban transformation in risky areas generally comprises the following stages: The term "risky area" is defined by the Urban Transformation Law as an area declared by the President of the Republic of Turkey ("President") that: (i) poses a risk of life and property loss due to its ground conditions or the nature of its settlement or construction, (ii) experiences disruptions to public order or safety that interrupt or disturb everyday life, (iii) suffers from inadequate planning or infrastructure services, (iv) contains buildings that violate zoning legislation or are structurally or infrastructurally impaired, or (v) has at least 65% of its total buildings in violation of zoning legislation or constructed without a building license (even if licenses may have been obtained after construction completion).   2.1 Identification of the Risky Area The power to designate an area as a "risky area" lies solely with the President. However, the Ministry is responsible for identifying and examining potential areas, compiling a report on the identified area, and presenting this report to the President for approval. Furthermore, property owners of buildings within a potential area also have the right to petition the Ministry to designate their area as a "risky area." According to announcements made by a Minister in April 2023, more than 3.3 million residences have undergone a transformation as of that date, with the transformation process for an additional 250,000 residences still in progress.   2.2 Property Owners' Decision: The 2/3 Rule Although urban transformation legislation allows public authority to directly engage in urban transformation processes and execute these projects independently or via contracted contractors, the primary rule outlined in the legislation advocates for project execution based on the mutual agreement of property owners. Both Article 6 of the Urban Transformation Law and the corresponding Regulations stipulate that a minimum of a 2/3 majority of shareholders of parcels or lots within risky areas must agree to reconstruct a new building on the parcels or lots. They must also decide to enter into a contract with the contractors using a flat-for-land method or a different type of construction agreement. Therefore, for independent contractors intending to conduct urban transformation projects in risky areas and even on risky buildings not located within these areas, it is crucial to negotiate with at least a 2/3 majority of shareholders to initiate construction projects. A policy aimed at the timely completion of transformation projects is in place, allowing the government to intervene when minority shareholders (representing at least 1/3 of the shares) do not participate in or oppose the transformation decisions made by others. The Urban Transformation Law regulates a unique system for the shares of the minority shareholder, prioritizing majority shareholders to acquire the shares of the minority shareholders. If the majority shareholders fail to acquire these shares, the Ministry will acquire them on behalf of the Treasury. The acquisition process under Article 6/1 of the Urban Transformation Law includes the following steps: The Ministry evaluates the fair market value of the minority shareholders' shares. The evaluated shares of the minority shareholders are auctioned off to shareholders who have entered into an agreement for the transformation project. The sale price cannot be less than the fair market value. For transformation projects taking place in risky areas, if the shares cannot be sold to the shareholders who entered into an agreement, the Ministry will purchase and hold the shares on behalf of the Treasury. The government's commitment to completing transformation projects promptly and avoiding a state of uncertainty in risky areas is evident through its willingness to intervene by acquiring the shares of minority shareholders if the majority shareholders cannot. By acquiring the minority shareholders' shares, the transformation projects can proceed more efficiently.   2.3 Agreement Between Property Owners and Contractors: Prerequisites For Contractors To Conduct Urban Transformation Projects In Risky Areas Once a minimum quorum of 2/3 of shareholders or property owners has been reached, transformation projects can be undertaken by independent contractors (or public enterprises). An agreement, typically titled "Promise of Sale of Immovable Property and Construction Agreement in Return of Flat" ("Agreement"), is entered into between the property owners and contractors for the transformation project. In this Agreement, the contractor pledges to complete the construction in line with the requirements of the Urban Transformation Law and the technical specifications mutually determined by the parties, in exchange for the transfer of ownership of specified parts of the building from the property owners to the contractor. The Agreement must also specify the rules of partition. Contractors undertaking urban transformation projects in risky areas must meet certain requirements outlined in the relevant legislation as part of the general intent of the Urban Transformation Law and related legislation. The practices that contractors may encounter under the Urban Transformation Law and Regulation during the initiation and continuation of construction projects are as follows:   2.3.1 Possession of a Contractor's License Article 5 of the Classification and Registration Building Contractors Regulation stipulates that the construction of all buildings requiring a construction permit in Turkey must be carried out by and under the responsibility of a contractor or a joint venture of contractors, who possess legal or real personality and must have a license number. As buildings in risky areas are subject to a construction permit, all contractors wishing to undertake an urban transformation project must possess or apply for a contractor's license that enables them to perform the work and conduct the construction activities for these types of projects. Article 8 of the Urban Transformation Law similarly mandates contractors to have a contractor's license by enumerating the requirements for obtaining one, which include: Financial Sufficiency Technical Sufficiency Minimum Work Experience Accordingly, contractors should apply for a contractor's license from the 15 different groups of licenses (A, B, B1, C, C1, D, D1, E, E1, F, F1, G, G1, H, Temporary Group) considering the specifics of the transformation project they are undertaking. The required license group depends on the size and square meters of the building planned to be constructed in the risky area.   2.3.2 Insurance and Warranty Obligations As part of the policy to complete the transformation efficiently and minimize the risk of infringing the rights of property owners, Article 8 of the Urban Transformation Law mandates that, besides the license obligation, contractors conducting transformation projects in risky areas must have one of the following insurance policies or warranties: A building completion insurance policy covering the risk of the contractor's failure to completevthe construction project. A warranty provided by the contractor to the Ministry, calculated based on the building construction area according to the existing zoning plan or the proposed zoning plan; 10% of the approximate cost of the building in areas with a construction area of up to 50 thousand square meters. For projects with a construction area over 50 thousand square meters; 10% of the approximate cost of the building for the first 50 thousand square meters of the construction area. 8% of the approximate cost of the building for the construction areas between 50 – 75 thousand square meters. 6% of the approximate cost of the building for the construction areas between 75 - 100 thousand square meters. 4% of the approximate cost of the building for the construction areas over 100 thousand square meters.   There are two options for contracting companies to carry out projects in risky areas: they can either provide the guarantee detailed above, or they can procure building completion insurance, the scope, conditions, and application principles of which are determined by the Ministry of Treasury and Finance. Contracting companies can commence construction by choosing one of these two options.   2.3.3 Contractor Sales Limitations The 10% Rule and Municipal Approval Requirement. Upon obtaining relevant insurance policies or providing warranties to the necessary authorities, contractors must evacuate buildings located in risky areas and initiate the transformation process by commencing construction. Typically, these contractors plan to pre-sell properties, which will eventually be theirs upon project completion, as a financial strategy to fund current and future projects.   Nonetheless, for projects in risky zones, contractors' rights to sell properties to third parties prior to project completion are restricted. As stipulated in Article 13 of the Urban Transformation Law, contractors may sell their properties based on the progress level of construction, and only with municipal permission. Therefore, contractors desiring to pre-sell must first apply to the municipality for approval. On receiving the contractor's application, the municipality must carry out the following actions upon receiving an application from the contractor to sell properties:   Gauge the construction progress and calculate the completion percentage, using credible and verifiable measures. Permit the contractor to sell properties up to but not exceeding 10% of the project's completion ratio. This limit helps protect the property owners' interests and ensure the completion of the project. Require full approval from all property owners for sales exceeding the 10% ratio. This ensures that all owners agree with the pace of construction and the plan to sell properties before the completion of the project.   Without unanimous approval from all property owners, contractors cannot sell properties beyond the 10% completion ratio. This rule helps ensure that all property owners have a say in the project and protects their rights and interests.   3. The Ministry's Ex Officio Authority to Complete Transformation Projects While it is crucial to consider property owners' perspectives in urban transformation policies, the completion of urban transformation, particularly in large cities, is critical for Turkey's societal welfare and national safety, considering the nation's geological structure and fault line map. Thus, despite property owners' evaluations being important, the Urban Transformation Law's Article 6/A amendment dated July 4, 2019, allows the Ministry to undertake urban transformation projects in areas posing a risk of building collapse or where buildings have been significantly damaged due to natural disasters. The Ministry can exercise this power on a wide array of areas defined in the Urban Transformation Law, not specifically restricted to risky buildings or areas.   The ways in which the Ministry's power is exercised are: The Ministry can perform the transformation projects by itself or through a contractor, without seeking the consent of the owners or related parties. The Ministry can facilitate all land registry and cadastral transactions, including sales, transfers, and liens. Additionally, all kinds of demolition and construction permits and procedures can be executed at the Ministry's request without needing property owners' consent. Any existing agreements on transformation projects within the execution area can be terminated without seeking the consent of the involved parties. The Ministry determines the quality and size of the housing and workplaces to be built in the areas. Entitlement studies take into account the existing property's value and the value of the new structure to be given to the property owner.   4. Case Study: Urban Transformation in The Fikirtepe District Fikirtepe, a neighborhood in Istanbul's Kadköy district, is currently hosting one of Turkey's most expansive urban transformation projects. The district's central location and an above-average number of unlicensed, derelict buildings spurred the need for urban transformation, initiated in 1999 after the devastating Marmara earthquake. However, despite several starts, projects in the area have never been fully completed due to disputes among property owners and contractors, and financial issues arising from prolonged dispute resolution processes. As a result, the Ministry has decided to use its ex officio authority to expedite the transformation processes, dividing the area into three separate lots. Lot 1, known as the "New Fikirtepe Project," covers areas where independent contractors have failed to complete transformation projects. The Ministry is now managing these transformations, though it currently only uses its ex officio authority in lot 1, with no restrictions on using it in the remaining lots.   5. Conclusion The catastrophic earthquake in 2023 that affected at least ten cities in Turkey and resulted in over 50,000 deaths has underscored the urgent need for urban transformation. As many of Turkey's major cities lie on active fault lines, urban transformation is of crucial importance, especially considering experts' predictions of an impending major earthquake in Istanbul. The Urban Transformation Law and its associated regulations provide a framework to ensure that these transformations are carried out in a way that protects the rights of property owners, provides for societal welfare, and upholds the principles of safe and sustainable urban development. Individual risky building transformations are often conducted through agreements between property owners and independent contractors. However, the role of the Ministry in managing transformations in risky and reserved areas has become increasingly significant. In situations where projects are delayed due to disputes or other complications, the Ministry's ex officio authority under Article 6/A of the Urban Transformation Law allows it to intervene and ensure the project's completion. A prime example of this authority's use is the New Fikirtepe Project in Istanbul's Kadköy district, where the Ministry is now managing transformations due to failures by independent contractors. Given the devastating earthquake in 2023 and the predicted future seismic events, it is foreseeable that the Ministry will become more proactive in exercising its authority. Urban transformation in Turkey is not only a matter of urban renewal and development but also a matter of national safety and resilience in the face of natural disasters. By striking a balance between the rights and interests of property owners and societal needs, the Turkish government aims to create a safer and more sustainable urban environment for its citizens. In conclusion, as Turkey continues to deal with the aftermath of the 2023 earthquake and prepares for future seismic events, the Urban Transformation Law and its regulations provide an essential framework for managing the necessary transformations. With a focus on ensuring the completion of transformation projects and protecting the rights of property owners, the government has demonstrated a strong commitment to ensuring the safety and welfare of its citizens.

Renewable Energy Project Finance In Turkiye

By Kesikli Law Firm Security Package Structuring Under the New Licensing Regime A Practitioner’s Guide for Lenders, Sponsors, and Investors   Introduction Türkiye’s renewable energy sector has entered a new and remarkably dynamic phase. The country’s ambition to more than double its wind capacity and quadruple its solar capacity by 2035, combined with a net zero target for 2053, has created an environment in which project finance transactions are becoming larger, more complex, and more demanding in terms of legal structuring. As of 2025, Türkiye ranks among the top five European countries in installed renewable capacity and continues to attract significant attention from both international development finance institutions and commercial lenders. At the same time, the regulatory landscape has undergone substantial transformation. The amendments introduced in the last quarter of 2025, the enactment of Law No. 7554 (commonly referred to as the “Super Permit” legislation) in July 2025, and the continued evolution of EMRA’s licensing framework have fundamentally reshaped the way renewable energy projects are developed, financed, and secured in this jurisdiction. For those of us advising on these transactions daily, the interplay between the new licensing rules and the requirements of a bankable security package has become one of the most critical areas of legal practice in the Turkish energy market. This article draws on our experience in structuring and negotiating project finance transactions across the wind, solar, and hybrid segments in Türkiye. We aim to provide a practical, grounded analysis of how security packages should be approached under the current regime, with particular attention to the issues that matter most to lenders and their counsel.   The Evolving Licensing Framework: What Has Changed To properly structure security in a Turkish renewable energy project financing, one must first understand the licensing architecture and the recent shifts within it. The two-tier system of preliminary licence ("ön lisans") followed by a generation licence ("üretim lisansı") remains the backbone of the regulatory framework under the Electricity Market Law No. 6446. However, the practical operation of this system has been significantly refined. One of the most consequential changes introduced by the December 2025 amendments is the new deadline regime for licence transfers. EMRA approval for transfers of licensed generation facilities now comes with a mandatory completion window, which cannot be shorter than six months. If the parties fail to complete the transfer within this period, the approval lapses automatically. This is a critical consideration for lenders structuring step in rights, since the enforceability of share pledge arrangements and the ability to substitute sponsors ultimately depend on the transferability of the underlying licence. The harmonisation of YEKA (Renewable Energy Resource Area) project timelines with general electricity market licensing rules is another meaningful development. Previously, YEKA projects operated under a somewhat parallel regulatory universe, with their own extension mechanisms and timelines. The 2025 amendments have brought these projects into closer alignment with the standard regime, including the notable change that extensions of preliminary licence periods for YEKA projects are no longer automatic but require the affirmative consent of the Ministry of Energy and Natural Resources. For lenders to YEKA projects, this introduces a degree of discretionary risk that was not present before. The “Super Permit” legislation under Law No. 7554 merits particular attention. This law, which took effect in July 2025, grants EMRA the authority to conduct urgent expropriation procedures for renewable energy investments through the end of 2030, with a possible five-year extension by presidential decree. It also extends the 85% discount on permit, lease, and easement fees to generation facilities commissioned before 31 December 2030 (previously, the cutoff was 2025). These provisions are designed to remove land acquisition bottlenecks and reduce costs, but they also create new dynamics for security structuring, particularly around land rights and the enforceability of mortgages on project sites. On the unlicensed generation side, facilities with installed capacity of 5 MW or less continue to benefit from a lighter regulatory framework. The November 2025 amendments clarified the technical review procedures for these projects, requiring centralised evaluation through the YEKİS monitoring system with strictly defined deadlines. While unlicensed projects typically involve simpler financing structures, the tightening of procedural requirements means that lenders should no longer assume that the regulatory risk profile is negligible.   The Architecture of a Turkish Project Finance Security Package Turkish law does not recognise the concept of a floating charge over all present and future assets as it exists in common law jurisdictions. Security must therefore be structured on an asset-by-asset basis, with each element of the package requiring its own perfection steps and documentation. This reality makes the construction of a comprehensive security package in Türkiye both technically demanding and strategically important. We set out below the principal components of a well-structured security package in a Turkish renewable energy project financing, drawing on current market practice and the latest regulatory requirements.   Share Pledges and Sponsor Security The pledge over the shares of the project company (the SPV) is typically the cornerstone of the security package. For joint stock companies ("anonim şirket"), which are the standard vehicle for licensed energy projects, perfection requires execution of a written pledge agreement, endorsement of the share certificates (or temporary certificates), physical delivery of those certificates to the lenders or their security agent, and recording of the pledge in the company’s share ledger. Where the SPV is structured as a limited liability company, the pledge agreement must additionally be notarised. The share pledge is the primary mechanism through which lenders exercise control over a distressed project. Upon an event of default, enforcement typically proceeds through public auction under the Enforcement and Bankruptcy Law No. 2004. However, the Movable Pledge Law No. 6750 also opens the possibility for the pledgee to request transfer of ownership of the pledged shares, or to assign the receivable under the pledge to a licensed asset management company. These alternative enforcement routes, while not yet extensively tested before the courts, are increasingly being documented in project finance agreements. One must also bear in mind the regulatory overlay. Any change of control in a licensed generation company requires EMRA notification (and, depending on the threshold, approval). The 2025 amendments have extended this notification obligation to all licence holders whose tariff is not subject to regulation, not just generation licence holders. Lenders should therefore ensure that their step-in and enforcement provisions are structured to allow sufficient time for regulatory approvals, particularly given the new mandatory completion windows for licence transfers.   Mortgages Over Project Land and Real Property Mortgages over the project site are a standard feature of any renewable energy financing. Under Turkish law, a mortgage must be executed before the relevant land registry ("tapu müdürlüğü") and registered to be perfected. Türkiye employs a fixed rank system for mortgages: the creditor holding the highest-ranked mortgage is paid first upon foreclosure, regardless of the date the security interest was actually created. This makes the priority of lender mortgages a matter of considerable commercial importance. For foreign currency-denominated loans (which remain common in project finance), the mortgage amount may be expressed in the relevant foreign currency, which avoids the currency mismatch that would otherwise arise if the mortgage were denominated in Turkish Lira. This is one of the exceptions to the general rule requiring mortgage amounts to be stated in Lira. The Super Permit legislation introduces new considerations for mortgage structuring. Where EMRA exercises its urgent expropriation powers to acquire privately owned land for a renewable energy project, the nature of the project company’s interest in the land may shift from ownership to a right of use or easement. Lenders will need to confirm that their mortgage (or, where applicable, their usufruct pledge) properly covers the specific form of land interest that exists following any expropriation or administrative reallocation. In our experience, this is an area where careful title due diligence at the outset pays significant dividends.   Pledges Over Movable Assets and Equipment Wind turbines, solar panels, inverters, transformers, and balance of plant equipment represent a substantial portion of the capital value in any renewable energy project. Pledges over these assets are governed primarily by the Movable Pledge Law No. 6750, which introduced a registry-based system for commercial movable pledges. Perfection requires execution of a notarised pledge agreement and registration with the TARES electronic movable pledge registry. The law also permits the pledge of entire commercial enterprises, which can capture a broad range of present and future assets (though not immovable property). An important practical point: certain categories of movables, including ships, aircraft, motor vehicles, trademarks, and mining rights, fall outside the scope of the Movable Pledge Law and require registration with their own specialised registries. While these exclusions are less commonly encountered in renewable energy projects, they become relevant in hybrid or multi-purpose facilities.   Assignment and Pledge of Receivables The assignment of receivables under key project contracts is one of the most commercially significant elements of the security package. This typically covers revenues under offtake agreements or power purchase agreements, payments under EPC and O&M contracts, insurance proceeds, and any other material income streams of the SPV. Under Turkish law, the assignment of receivables requires a written agreement and takes effect without the debtor's consent. However, as a matter of prudent practice, lenders invariably require notification of the debtor and an acknowledgement of the assignment. Without such notice, a debtor that makes payment in good faith to the original creditor (the project company) may be discharged from its obligation, which obviously undermines the purpose of the assignment from the lender’s perspective. Future receivables are also assignable under Turkish law, provided that they are sufficiently identified or identifiable at the time of assignment. This is particularly relevant for project finance, where the revenue stream from a power plant may extend decades into the future. A valid assignment automatically transfers all ancillary rights attached to the assigned receivable, including any security interests that secure it. In the context of the updated YEKDEM (Renewable Energy Sources Support Mechanism), lenders should pay close attention to the revised settlement methodology. The 2025 amendments clarified that energy stored under the YEKDEM framework and fed into the grid after the facility exits the support scheme will not count toward YEK settlement. This may affect projected revenue streams and, consequently, the value of assigned receivables for lenders relying on YEKDEM income as part of their base case.   Account Pledges and Cash Waterfall Mechanisms Control over the project company’s bank accounts is central to any project finance security package. Account pledges are perfected through execution of a pledge agreement and notification to (and acknowledgement by) the relevant account bank. The bank then records the pledge in its internal systems, confirming the lenders’ priority. In practice, the cash waterfall is typically documented through a combination of the account pledge agreements and a detailed accounts agreement or common terms agreement. The waterfall governs the priority of disbursements from project revenues: first to operating expenses, then to debt service, then to maintenance reserves, and finally (if surplus remains) to equity distributions. Lenders normally require exclusive control over the project’s banking arrangements, which is achieved by requiring all project revenues to flow into pledged accounts maintained with an acceptable account bank.   Insurance Assignments and Creditor Protections Insurance is a critical but sometimes underappreciated element of the security package. Under Turkish Insurance Law No. 5684, insurable interests located in Türkiye belonging to Turkish residents must, as a general rule, be insured by insurance companies operating in Türkiye. However, reinsurance abroad is standard practice and both original policies and reinsurance contracts are assignable. Market standard protections include recording the lenders or security agent as loss payee and, where appropriate, as additional insured or co-insured. Restrictions on cancellation or material amendment without prior notice to lenders are also customary. Insurance proceeds from material claims should be directed into controlled accounts and applied through the agreed cash waterfall. Importantly, Turkish law permits insurance proceeds to be payable to, and security to be created for the benefit of, foreign secured creditors, which remains a critical consideration in cross-border financings.   The Parallel Debt and Security Agent Structure Turkish law treats pledges and mortgages as accessory ("ancillary") security interests, meaning that the holder of the security right must also be the creditor of the secured obligation. This principle presents a structural challenge in syndicated loan transactions, where multiple lenders share a common security package held by a single agent. The solution that has become market standard in Türkiye is the parallel debt structure. Under this arrangement, the project company acknowledges an independent, abstract obligation (the “parallel debt”) in favour of the security agent, in an amount equal to the aggregate obligations owed to all lenders under the facility agreement. The security interests are then established to secure this parallel debt, with the security agent as the direct creditor and security holder. While the parallel debt mechanism is now deeply embedded in Turkish project finance practice, it has not yet been definitively tested before the Turkish courts. In our view, the structure is consistent with the principles of Turkish civil law: the certainty of the pledged claim is satisfied because the parallel debt arises from a specific legal transaction, and the accessory principle is preserved because the security agent is both the creditor and the security holder. Nevertheless, prudent counsel should be transparent with clients about the residual enforceability uncertainty and should ensure that parallel debt provisions are carefully drafted to withstand judicial scrutiny.   Direct Agreements, Step In Rights, and Substitution Direct agreements between lenders and key project counterparties (the EPC contractor, O&M provider, offtaker, and sometimes the relevant governmental authority) are a fundamental part of the security architecture. Their purpose is to give lenders the right to step in and cure defaults under the relevant project contracts before those contracts can be terminated, and to facilitate the substitution of the project company or its sponsors if enforcement becomes necessary. The enforceability and practical utility of step in rights in Türkiye depend heavily on the transferability of the underlying licence. Under the current regime, any transfer of a licensed generation facility requires EMRA approval, and the 2025 amendments have imposed strict completion deadlines. Lenders should therefore negotiate step in and substitution mechanisms that explicitly account for the regulatory approval timeline, including standstill provisions that prevent counterparties from terminating project agreements while the EMRA approval process is underway. For YEKA projects, an additional layer of complexity arises from the relationship between the YEKA contract and the licence. If the Ministry terminates a YEKA contract and notifies EMRA, both the preliminary licence and the generation licence may be revoked. This means that the value of step in rights in YEKA projects is directly linked to the stability of the YEKA contractual framework. Lenders to these projects should seek robust cure periods and consultation rights before any ministerial termination can take effect.   Perfection, Priority, and Enforcement: Practical Considerations Each element of the security package carries its own perfection requirements, and failure to observe these formalities can be fatal to the enforceability of the security. We summarise the key points below. For share pledges over joint stock companies, the sequence is: written agreement, endorsement, physical delivery of certificates, and entry in the share ledger. For account pledges, the critical step is notification to and acknowledgement by the account bank. Movable pledges under the Movable Pledge Law require notarisation and registration in TARES. Mortgages require execution before and registration at the land registry. One favourable aspect of Turkish project finance practice is the blanket stamp duty exemption applicable to security documents where one of the parties qualifies as a financial institution. This means that, in most cases, there are no meaningful duties or fees payable to perfect security interests in project finance transactions, a material cost saving compared to many other jurisdictions. On enforcement, the general rule under Turkish law is that secured creditors have a right of preference over the sale proceeds of the secured assets. However, certain public receivables (such as tax claims) may rank ahead of or alongside the lender’s security in a bankruptcy scenario. Additionally, lenders face clawback risk: other creditors of an insolvent debtor may apply to courts to set aside certain transactions entered into during the suspect period before insolvency. Careful structuring and timing of security perfection can help mitigate these risks, but they cannot be entirely eliminated.   YEKDEM, Revenue Risk, and the Impact on Security Valuation The commercial viability of any renewable energy project finance transaction ultimately depends on the predictability of the revenue stream. In Türkiye, the YEKDEM feed in tariff mechanism has been the primary revenue support instrument for renewable projects. Facilities commissioned before 30 June 2021 benefit from USD denominated feed in tariffs for a period of ten years. Those commissioned after that date are subject to a revised mechanism with TL denominated tariffs adjusted quarterly based on a basket of indices (PPI, CPI, USD, and EUR), subject to USD indexed caps. The new YEKA tender framework introduces further variations. For projects awarded under the latest YEKA tenders, a minimum feed in tariff of USD 4.95 per kWh applies for the first five to six years, followed by a fixed rate for the subsequent twenty years, with the remaining licence period subject to free market conditions. These structures offer a degree of revenue visibility, but they also introduce step down risks and transition periods that must be carefully modelled in the financial projections underpinning any lending decision. From a security perspective, the value of assigned receivables is only as strong as the revenue certainty behind them. Lenders should ensure that their base case financial models conservatively reflect the applicable tariff structure, including any phase out or transition provisions. Where the project is approaching the end of its YEKDEM support period, the shift to merchant risk is a material factor that will affect both the terms of the financing and the structure of the security package.   ESG, Green Finance, and Evolving Compliance Expectations The green finance dimension of Turkish renewable energy project finance has matured significantly. Türkiye’s sustainable finance taxonomy, which is being developed in alignment with the EU taxonomy framework, will require institutions subject to sustainability reporting rules to report taxonomy aligned revenue and capital expenditures from 2026 onwards, with mandatory disclosures following from 2027. This alignment is expected to facilitate cross border green investments and should, over time, reduce the cost of capital for compliant projects. International lenders increasingly require compliance with the Equator Principles and IFC Performance Standards as a condition of financing. Adherence to these frameworks involves environmental impact assessments, stakeholder engagement, biodiversity management, and ongoing monitoring and reporting obligations. While these requirements add to the upfront cost of project development, they also serve a risk mitigation function. Projects that meet international ESG standards are less likely to face regulatory enforcement actions, community opposition, or reputational damage, all of which can materially affect the value of the lender’s security. The proposed streamlining of Environmental Impact Assessment procedures under the Super Permit framework, which envisions EIA completion within three to six months and the possibility of conducting other permit applications simultaneously, has drawn some criticism from environmental organisations. Lenders should be mindful that expedited EIA processes may increase the risk of subsequent legal challenges to project permits, which could in turn affect the stability of the licence and the enforceability of security interests tied to it.   Structuring Recommendations for Market Participants Based on our experience across a wide range of Turkish renewable energy financings, we would highlight several key structuring considerations for market participants navigating the current environment. First, the new deadline regime for licence transfers demands that step in and enforcement provisions in facility agreements and direct agreements be carefully calibrated to the regulatory timeline. Lenders should build in sufficient buffer periods and ensure that standstill mechanisms prevent premature termination of project contracts while EMRA approvals are pending. Second, the extension of the commissioning deadline for the 85% permit fee discount to 2030 under Law No. 7554 creates opportunities for projects to benefit from reduced land costs, but it also means that lenders should verify the precise nature of the project company’s land interest (ownership, leasehold, easement, or right of use) and tailor their mortgage or pledge documentation accordingly. Third, the evolving YEKDEM and YEKA tariff structures require lenders to model revenue streams with a high degree of granularity. Security packages should be stress tested against downside scenarios, including tariff step downs, currency fluctuations, and the transition from supported to merchant pricing. Fourth, the parallel debt structure, while well established in practice, should be documented with meticulous care. Given the absence of definitive court precedent, the drafting of the parallel debt clause, the abstract acknowledgement of debt, and the related security documents should leave no room for ambiguity about the independent nature of the security agent’s claim. Fifth, with Türkiye’s sustainability taxonomy and mandatory ESG disclosures on the horizon, sponsors and lenders alike should proactively integrate ESG compliance into their project development and financing frameworks. Projects that are taxonomy aligned from the outset will find it materially easier to access green bonds, concessional finance, and international development bank support.   Conclusion Türkiye’s renewable energy sector stands at a point of genuine inflection. The regulatory reforms of 2025, the Super Permit legislation, and the continuing evolution of the licensing and incentive frameworks have created a more structured but also more demanding environment for project finance. For lenders, the quality of the security package is not merely a legal formality; it is the foundation upon which the entire risk allocation of the transaction rests. We believe that the Turkish market offers compelling opportunities for well-structured renewable energy investments. The key to realising those opportunities lies in rigorous legal analysis, careful coordination between regulatory, corporate, and financing workstreams, and a willingness to engage with the nuances of a legal system that, while civil law in origin, has developed its own distinctive project finance practice. Those who take the time to get the structuring right will find that Türkiye rewards diligence with bankable, enforceable, and commercially sound transactions. By Kesikli Law Firm