On 18 September 2010, the Turkish power system was synchronized with the interconnected power systems of Continental Europe.

TurkeyEnergy and Natural Resources

On 18 September 2010, the Turkish power system was synchronized with the interconnected power systems of Continental Europe. The parallel trial operation consisting of three phases was intended to last one year. However, the stabilization period, the first phase of the parallel trial operation, lasted longer than expected. The second phase, non-commercial energy exchange between Turkish ("TEIAS") and Bulgarian ("ESO") and Greek ("HTSO") transmission system operators ("TSOs"), began in late February 2011 and was completed in mid-April 2011. Finally, ENTSO-E announced that the third phase, the limited commercial energy exchange between Turkey and Greece and Bulgaria would start on June 2011.