An Overview Of Mediation Under The Pusat Mediasi Covid-19

The PMC-19 will commence operations from 16 November 2020 and is only subject to the Act and not the Mediation Act 2012

MalaysiaLitigation, Mediation & Arbitration
The Temporary Measures for Reducing the Impact of Coronavirus Disease 2019 (Covid-19) Act 2020 ("the Act"), which came into operation on 23 October 2020, sets out the provisions relating to Mediation in Section 9.

Any dispute in respect of the inability of any party to perform any contractual obligation arising from any of the categories of contracts specified in the Schedule to Part II of the Act ("Scheduled Contracts") due to the measures prescribed, made or taken under the Prevention and Control of Infectious Diseases Act 1988 to control or prevent the spread of Covid-19 may be settled by way of mediation.1 These include:

  • Construction work contract or construction consultancy contract and any other contract related to the supply of construction material, equipment or workers in connection with a construction contract