Share on LinkedInShare on LinkedIn

ARTICLE · 14 NOVEMBER 2024

Gross Split Production Sharing Contracts: Commercial Insights From Indonesia's MEMR Regulation No. 13 Of 2024

SSEK Law Firm
SSEK Law Firm
Contributor
SSEK Law Firm

SSEK Law Firm

SSEK Law Firm was founded in 1992 and is today one of the largest and most highly regarded...

View firm profile
Explore more from SSEK Law Firm

In a decisive move to streamline Indonesia's upstream oil and gas sector, the Minister of Energy and Mineral Resources ("MEMR") issued Regulation No. 13 of 2024 ("MEMR Reg 13/2024"), introducing a revised...

IndonesiaEnergy and Natural Resources

In a decisive move to streamline Indonesia's upstream oil and gas sector, the Minister of Energy and Mineral Resources ("MEMR") issued Regulation No. 13 of 2024 ("MEMR Reg 13/2024"), introducing a revised framework for Gross Split Production Sharing Contracts ("Gross Split PSC").

MEMR Reg 13/2024 alters the commercial landscape for oil and gas upstream companies operating in Indonesia, with an emphasis on efficiency, reduced bureaucracy, and enhancing flexibility in profit-sharing arrangements with an adjusted base split to favor contractors.

MEMR Reg 13/2024 replaces MEMR Regulation No. 8 of 2017 ("MEMR Reg 8/2017").

Streamlined and Flexible Structure

In the Gross Split PSC framework, production sharing contractors incur their operational and capital expenses upfront, without a cost-recovery mechanism. They benefit from a gross production sharing model where their share of production is allocated based on predetermined percentages, allowing for a more

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

See more popular content from