General Rule
The general rule is that a person who contracts to do work and
supply materials warrants that the materials used will be of good
quality and reasonably fit for its intended purpose, unless the
Contract excludes such warranty.1
Free Issue Items/Material
In McMurray v AIG Insurance Australia Ltd [No. 5]
[2021] WASC 300, 'free issue items' were defined to be:
building and construction materials (including debris)
wheresoever located, or in transit and which are supplied or to be
supplied in connection with the Contract Work, Temporary Work or
Works' by the party to the contract who is not carrying
out the work. (emphasis added).
From the definition in Murray, the Principal, being
'the party to the Contract who is not carrying out the
work', is the supplier of free issue materials.