Defective EQC Repairs? Time's running out...
If you bought an EQC repaired house after the Canterbury
Earthquakes and before 15 August 2019 and you have concerns about
the quality of the repairs, the clock is ticking. You only have
until 14 August 2020 to register your interest in
an EQC ex gratia payment for repair costs.
So, if you have niggling concerns about whether all of the EQ
damage has been repaired and/or the quality of the repair work ,
you have less than three months to register your
interest to protect your position:
https://www.eqc.govt.nz/canterbury/on-sold-over-cap-properties.
Ideally, you'll want to include a Licensed Building
Practitioner or structural engineer's report on the inadequate
or failed repairs. EQC usually reimburses these costs.