Share on LinkedInShare on LinkedIn

ARTICLE · 27 NOVEMBER 2024

Decision highlights need for effective limitation of liability clauses

Parties negotiating construction contracts should ensure that they include an effective limitation of liability clause.

New ZealandCorporate/Commercial Law

Engineers and their insurers can breathe a sigh of relief following the High Court's recent decision in Tauranga City Council v Harrison Grierson Holdings Limited & Constructure Auckland Limited [2024] NZHC 714 (28 March 2024). The Court determined as a preliminary issue that the defendant engineers could rely on their contractual limitations of liability to limit any liability they have to Tauranga City Council (TCC) as the owner of non-residential building.

Background

Following the alleged failure of an intended transport hub for 550 cars and 250 bicycles in the centre of Tauranga, the TCC issued proceedings against the design engineer and the peer review design engineer seeking in excess of $20 million in claimed losses. TCC alleged five causes of action against the defendant engineers: Breach of contract, negligence, negligent misstatement, breach of the Fair Trading Act and the novel claim that the engineers breached their statutory duty. The Court was

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

See more popular content from