MahWengKwai & Associates ("MWKA") hosted its inaugural online talk, touching on a popular subject in the construction industry. The topic "How should Contractors in the Construction Industry Manage the Problems arising from the COVID-19 MCO?" was delivered over two days, on 2.4.2020 and 3.4.2020. The online talks were well received, with almost 300 attendees tuning in on both days.

This article features frequently asked questions (FAQs) which arose during the online talks. You may access the slides here and the recording of the talks for Day 1 here and Day 2 here.

Summary of the Online Talks

The Movement Control Order ("MCO") has forced most businesses in the construction industry to suspend their operations. According to the FAQs issued by the Ministry of Works on 18 March 2020 (updated on 24 March 2020) and 1 April 2020, only construction works that fall within the definition of "critical works" may continue during the MCO period. All other construction and