On 29 December 2025, the Minister of Energy and Mineral Resources (“MoEMR”) issued MoEMR Regulation No. 19 of 2025 on Hybrid Power Plant (“MoEMR Reg. 19/2025”).

IndonesiaEnergy and Natural Resources

On 29 December 2025, the Minister of Energy and Mineral Resources (“MoEMR”) issued MoEMR Regulation No. 19 of 2025 on Hybrid Power Plant (“MoEMR Reg. 19/2025”). The regulation has the objectives to: (i) encourage the implementation of the diesel reduction program; and (ii) provide legal certainty for the development of hybrid power plants connected to small-scale electricity networks.

  1. Variations of Hybrid Power Plant

MoEMR Reg. 19/2025 stipulates that Hybrid Power Plant is a source of electricity generated from the configuration of multiple renewable energy sources and/or energy storages implemented on “small-scale networks”, referring to the operation of an independent network of power plants connected to a local distribution network that provides electricity to communities in small islands or isolated areas.

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

See more popular content from