Suspension And Termination Under FIDIC Red Book (First Edition, 1999)

Our Associate Budoor Alhalwachi examines contractor remedies under the FIDIC Red Book for delayed payments, alongside relevant protections under Bahraini law.

BahrainReal Estate and Construction

FIDIC contracts are the foremost contracts used in international construction and engineering projects. The form of contract known as the FIDIC Red Book is the Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer (First Edition, 1999) is arguably the most used within the FIDIC suite of contracts (hereinafter the Red Book).

The Red Book is intended for use in the traditional form of contracting where the employer provides the design, and the contractor constructs the works in accordance with the design. The contractor may also receive additional instructions, typically limited to elements requiring specialist input or detailed technical specifications. The contract price is determined by remeasurement and evaluation at the rates and prices contained within the contract. This allows tenders to be based on estimated quantities (possibly before detailed design for all the project elements has been completed) and the final

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

See more popular content from