The photovoltaic power plant in Tuchlovice faced
a complaint filed by the supreme prosecutor
who had proposed the termination
of its license. The motion for the license
termination was satisfied by the Regional Court
in Brno as it was ascertained that
the power plant did not have a due audit
report available, which would certify its safety.
In fact, the reviewed audit report was prepared
at the time when the power plant
was not equipped with
all of the photovoltaic panels.
The decision was reviewed
by the Supreme Administrative Court, which concluded that
the decision on granting the license should
not have been revoked. In its opinion, the main
reason is good faith which was obviously present
on the part of the power plant operator.
The audit report, which the Regional Court in Brno
evaluated as insufficient, was actually drafted
in compliance with the then-existing practice approved
by the Energy Regulatory Office. The power plant
operator also